Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Brian_PE

    Junction loss Across catch basin with sumped bottom

    I think you're correct. I think I found a work around, so hopefully the county buys in on it.
  2. Brian_PE

    Junction loss Across catch basin with sumped bottom

    I'm looking for any info on calculating the junction loss across a inlet box with a sumped bottom. We received a comment for the Township requesting specific loss value. I currently have the pipes modeled in Hydraflow/Civil3D and have no way accounting for the basin invert depression. Any...
  3. Brian_PE

    Contractor Dispute for unreturnable parts.

    Thanks the the various inputs - all of your responses are very helpful. Ron - to clarify - my company was awarded a project from the facility owner, Company A. I hired Company B to complete the mechanical (pipeline and pumping station) portion of the work. I am the designer and the PM I have...
  4. Brian_PE

    Contractor Dispute for unreturnable parts.

    Background - I was involved in a PO for a small pipeline and pump station project with a utility contractor. 3/4 through the job, the Owner kicks my utility contractor off the job, and brought in their own people to complete the work. My contractor sought to return parts purchased for the job...
  5. Brian_PE

    Leachate Lift Station Relocation

    Here are the details, but the basic process is a stopping flow in an active leachate line. Pipe size is 8x12 DC pipe, gravity flow from the cell into an existing PS. Basically, there is existing waste adjacent to an existing PS. The PS will need to be moved, and the primary and containment...
  6. Brian_PE

    Leachate Lift Station Relocation

    Hi I'm working on a project that will require the relocation of a leachate lift station for a landfil expansion. The leachate collection line for this lift station relocation cannot be accessed from the top. I'm lookiinf for information on a plugging procedure (ie hot tap) that would allow me...

Part and Inventory Search

Back
Top