  1. audeuce02

    Reduce the size of column Pre-Eng Building

    I have no reason to continue to defend my craft. I am out of here.
  2. audeuce02

    Reduce the size of column Pre-Eng Building

    I apologize. Its just a culmination of all threads regarding PEMB.
  3. audeuce02

    Reduce the size of column Pre-Eng Building

    Why does everyone jump straight to this issue being due to negligence from the PEMB? We work from Contract Documents and follow the Code just like any other SE group, so why should I be labeled as a bad engineer. There is a lot of good information shared here, but there is also a lot of witch...
  4. audeuce02

    Chapter 34 and Metal Buildings?

    There is a little test data out there that shows a "friction diaphragm" that will occur between the purlin and roof panel when insulation is compressed. I would not rely on this, but I could probably drag out some documentation if you need it. The other consideration would be actual loading...
  5. audeuce02

    PEMB that experienced maximum design snow load

    I agree completely with a2mfk. The problem is that owners and contractors are not willing to absorb the expense associated with coordination. I have 15 years design experience with multiple PEMB companies and have now moved to the sales side. It is appalling the lack of knowledge some of the...
  6. audeuce02

    Rail Crane Column Brackets

    Toad, Were the 6-8' brackets actually fabricated as a bracket, or was it a 6-8' section of beam attached to the columns flange like a column segment?
  7. audeuce02

    Blacksburg gym collapse

    I will agree with Hokie, that it appears to be preperation for a lawsuit after the deepest pocket that can be found. I will also agree with Jed that it appears that they were approaching the site from more of a shoring and remedial stanpoint than an investigation standpoint. My question is...
  8. audeuce02

    Foundation Reactions

    Am I thinking wrong, or does ACI 318-05 not require the use of factored service loads. The maximum reaction should be used for a check only. I agree with JAE, send him a fee letter stating what it will cost him for you to do his job.
  9. audeuce02

    What grade of steel used in PEMB Girts and Purlins - circa 1974?

    I am a PEMB Engineer, and I am suprised that everything is not failing for the current Code. Just losing the 1/3 stress increase for transient loads should be causing significant problems. In 74 the building was most likely designed as 12/20/20 (12 psf frame load, 20 psf roof secondary load...
  10. audeuce02

    Questionable Engineering Design

    I am suprised that it hasn't been questioned if the building was actually designed. It is common practice in rural areas for buildings of this nature to just be built, with no design consideration. The exception would be if the Fire Department received matching funds from the state or federal...
  11. audeuce02

    ASCE 7-10

    It looks like ASCE is following New Zeland and Austalia on the wind. Corner, edge, and endzones are nothing to them. They have about 10 different zones on the roof surface for variable wind load.
  12. audeuce02

    Analyzing Existing Metal Building

    As an engineer with a PEMB company, I would reccomedn that you go back to the original manufacturer and have them do the analysis. Are they going to charge for the analysis of the strucutre and the specification of the re-enforcment? You better believe it, just like every SE on here that has...
  13. audeuce02

    pre-engineered metal building purlins

    Roof huggers or retro zees over the existing roof panel is actually a fairly common practice now. The major issue with the added load is having to bring the structure up to the current code. With that you lose the 1/3 stress increase for transient loads in the older buildings which typically...
  14. audeuce02

    Loose gusset plates...

    Unless it is in SDC D or there are dynamic loads such as cranes, I would expect either snug tight or turn of the nut method for bolt tightening. Calibrated wrench is a touchy subject, because most PEMB connections do not require washers and the bolt/endplate configurations do not work out for...
  15. audeuce02

    metal building versus conventional steel framing

    One of the boys in the Ivory Tower. The Delta Joist is and was a slick system, but I believe they have stopped offering it. Panelizing the roof on the ground significantly sped erection and lowered cost in the field.
  16. audeuce02

    Metal Roofing used as Diaphragm

    There are a few standing seam roof systems on the market that have a stated diaphragm capacity, but I would not rely on the panel due to the rib construction and buckling of the flat (pan) of the panel. Best best is to use CDX or a through fastened panel. What type of panel spans are you...
  17. audeuce02

    metal building versus conventional steel framing

    Everybody should try it for a little while. You have to be creative to bring some of the commitments that the completely uneducated sales staff to reality. I am to the point that if I here one more "I didn't think that note was important", or "that does really apply, does it, my head is going...
  18. audeuce02

    metal building versus conventional steel framing

    The attached has an error. The eave drift for cab operated and pendant operated hoist is transposed.http://files.engineering.com/getfile.aspx?folder=cc8885d7-7b09-4e38-9873-9d9ea665bd7c&file=Pages_from_Design_Guide_3.pdf
  19. audeuce02

    Pre-engineered building - Tie Rods

    Dave, Do you have the actual "Foundation Design and Construction Manual", or a copy of it? During one of my moves, I have misplaced mine and can not locate a replacement.
  20. audeuce02

    metal building versus conventional steel framing

    Undoubtedly some of your experiences with PEMB has been with piss poor comapnies to say the least. The issue of deflection/servicability is being completely misunderstood for the PEMB companies that are MBMA/AISC MB/IAS AC 472. We meet or exceed the published servicalbility criteria in the...