Thanks Heaviside,
shvet!, You say that is a Very Basic, Sounds you master this matter. Give me an accurate answer by providing an example, for instance.
From my side, I checked I have not found.
Dear Heaviside,
Can we import a Hysys simulation case file to Aspen InPlant cost estimator§
Because if you want to import it to AICE, you will have only IZP files.
Please any idea.
Regards,
Thanks Heaviside1925, for your prompt reply.
I am estimating for my company that produces and sale oil and gas.
Frankly speaking, I did not get you when you say (If you are capitalizing engineering and management, then yes it would be included but if you are expensing these services then no)...
Hi everybody,
I am a process engineer in Oil& Gas Company. I was assigned to make an estimation of a Project dealing with Crude Oil Separation, Before awarding EPC Contract with EPC Contractor.
So, I am using Aspen Economic Analyzer, which gives me an estimated Capital Cost.
My Question is...
Hi evreybody;
I am newly involved in Linear Alkyl Benzene project for designing a new petrochemical unit,However, based on simplified Process Flow Diagram of Removal Heavy aromatics adsorption beds unit, there is a trim bed adsorption between the 02 main adsorption beds A & B. This trim bed is...