1946ladjal
Petroleum
- Apr 16, 2009
- 8
Hi everybody,
I am a process engineer in Oil& Gas Company. I was assigned to make an estimation of a Project dealing with Crude Oil Separation, Before awarding EPC Contract with EPC Contractor.
So, I am using Aspen Economic Analyzer, which gives me an estimated Capital Cost.
My Question is:
Is the Cost of Engineering and Management services included in this Evaluation, Or No?
Please if anyone has a reponse to my question.
Regards,
I am a process engineer in Oil& Gas Company. I was assigned to make an estimation of a Project dealing with Crude Oil Separation, Before awarding EPC Contract with EPC Contractor.
So, I am using Aspen Economic Analyzer, which gives me an estimated Capital Cost.
My Question is:
Is the Cost of Engineering and Management services included in this Evaluation, Or No?
Please if anyone has a reponse to my question.
Regards,