OHGW - overhead ground wire on a transmission tower: want to ask if this GROUND conductor (which is installed at the highest position of the transmission tower) should be a BARE conductor or JACKETED conductor.... I thought : IN CASE OF LIGHTNING STRIKE, the bare conductor completes the...
I confirmed the IC 5534 is a high speed op amp,
Product Name NE5534
Product Type Operational Amplifier (Op-Amp)
Supply Voltage +/- 3V to +/- 22V
I believe the circuit is INCOMPLETE.... There is no feedback.
The circuit should not apply the input signal from v+ to v- (and then have the...
Hello again, let me offer a link for comparison
http://www.automatic-voltage-stabilizers.de/
it shows that typical regulation is 10 % to 25 %
On a previous email, I indicated that it is important to measure / characterize each transformer when you apply vin, and measure vout (and regulation)...
Hello Jorge, this is Cesar
I read your description of the Delta(3-phase input) and (Star or Y output) voltage stabilizer.
Here is something to think about.
Load current and voltage regulation are measured at the LOAD. That means that (even though this application is AC), (on a phase) you...
Here is what I found about the 2N3906 and 2N3904
2N3904 SI-N 60V 0.2A .35W 300MHz |
2N3906 SI-P 40V 0.2A .35W 250MHz
and here is an approach for the relay driver :
Start at the output, to determine what is required to activate the relay.
The relay "behaves"...