Please share your thoughts:
1. what factors come into play when we go choosing a specific XT ( Hor or Vertical).
2. What parameters in subsea production system are effected if we fix a production tubing size ( say 4.5" tubing)
Thanks,
Shree
Steve,
Thanks for your response. The problem I was tasked to work on is no different than what we usually do on our projects. Its just that I am a Floating Systems Engineer (12yrs exp) and trying to work my way into the Subsea Engineering field, hence the triviality of the questions I am...
Hello,
I am working on subsea tieback design as part of coursework for graduate studies. I would really appreciate if anyone could look through the problem and guide me towards solving some of the issues.
I attached the project(tieback problem) information below, please let me know how to...