This is an emergency lighting system that supplies emergency power for egress lighting loads on an offshore floating facility.I presently have it set at 110 % and 90% respectively.I was pretty sure I was close but wanted to get some feedback from other idustries.I do occassionally sync to my...
Thanks to everyone for sharing their information with me.My problem turned out to be a very simple one,at the time I was doing the trouble shooting I failed to check and set the droop settings on the voltage regulator after going through this process I was able to sync all three gen sets with no...
(DPC)Unit has digital fuel control system and units are set to droop for parallel operation.FYI>These units are on a new offshore floating facility which is a spar design.I will need the 3rd unit to be able to start an additional 1500 and 2000 hp water injection pumps.
I have 3 Solar Taurus 60 turbines driving 4160 vac 4.75 KW generators and am having load sharing problems.I can share load with the B & C machines but cannot load share the A& C machines without getting into a reverse power condition.I have checked wiring from Allen-Bradley Load share modules...