Yes, this is a great strategy if I can plan out and balance the load, perhaps as a hard-wired application. I am concerned about having receptacles. If somebody plugged in something that gets close to the receptacle max load unbalanced, the voltage drop would be catastrophic. Putting aside the...
Noob. I am trying to cost-optimize a branch circuit for a remote light display with a circuit distance of about 500 feet. US NEC applies. The remote lights will be commodity 120v equipment*, up to 1500W power required. My hope is to wire this with a 240V (split phase) buried branch circuit and a...