Hey Bramabull,yes a Multi Cycle Analysis is just another term for breaking the job into elements and taking cycle times of each respective element then averaging and combining those times to create a standard time for the job.I have used this method for years where the flow of the job is spread...
Dan21703,you are exactly correct and yes the different wieghts and grades of asphalt have been factored into the equasions.I have concluded that for the topping or residential types of asphalt the standard rate of application would most likely fall in the range of .080 to 1.50 second per square...
Hello,a little background about myself will help explain the complexity of my question.I am a senior engineer with well over two hundred thousand time,motion and production studies under my belt using all methods of obtaining the data to arrive at a relative conclusion.I have studied all sorts...