    NDT/NDE After Fabrication and Delivery of Filter Housing

    It was designed by an outsourced vendor and NDT was neither a design requirement nor a vendor requirement during design stage.
  2. KRR_SG

    NDT/NDE After Fabrication and Delivery of Filter Housing

    Thanks all. We are getting UT performed on the housing. HI DekDee, with regards to your comment "If ASME VIII Div 1 compliance is required then what your customer says they require is irrelevant", may I know where exactly in ASME VIII Div I I can find this? If somehow I can prove to customer...
  3. KRR_SG

    NDT/NDE After Fabrication and Delivery of Filter Housing

    Thanks for the response oknow, I am checking on those requirements too. Can you let me know if NDE can be performed (which ones) on the finished housing with electrolyzed surface
  4. KRR_SG

    NDT/NDE After Fabrication and Delivery of Filter Housing

    I have supplied a filter housing to a customer is Australia. Its a small housing that is installed as pre RO Filtration Housing. At the time of fabrication, there was agreement with the customer that no RT/PT (NDE) would be required and a hydrotest would be enough since these are mass produced...