Because it is mobile equipment, there is no single chief inspector we can go to. At this point we are all in agreement that the client needs the U stamp to do what they want to do. They need to be able to take this mobile equipment into any US jurisdiction. We are working on a remedy.
The...
JohnBreen
Not to waste anybody's time, but what specifically do you see in the spec that leads you to say....
"Simply stated, your vessels do not comply with the letter of your client's technical specification. It would be a waste of everybody's time to argue that point any further."
I...
Thanks for the feedback,
Our CRN registration does not require a U stamp. The fabricator is a holder of a TSSA (not ASME) certificate of authorization. As such, the welding procedures are part of the registered design, but a code stamp is not required to meet TSSA CRN registration...
I am looking for some clarification with regard to the ASME BOILER AND PRESSURE VESSEL CODE, SECTION VIII, DIVISION I. Does this section of the code require (or specify) that the vessel must be fabricated in a "U" stamp facility in order for the "VESSEL DESIGN AND FABRICATION TO COMPLY FULLY...