    Thermal Relief on the line

    Hi...it is not true to say that a thermal RV is required for any fixed volume. Selection and sizing is based on design conditions of the containment system, anticipated temperature rise, hazardous properties of the fluid, trapped volume etc. There is no formal guide or standard that applies...
  2. Phil100

    Process Line and Equipment Demolition

    You definitely need to ensure that thorough preparation work has been carried out to identify and mark lines for demolition from those to remain; protect services such as P&C cables, comms cables etc; decontaminate lines to be removed; cordon off the area; document a risk assessment; ensure...
  3. Phil100

    Design of Flare system

    I think that it will be virtually impossible to guarantee that a buried flare header is drained and hence at full capacity and available to receive pressurised releases. The flare is intended to be the ultimate safe release point for any overpressure excursions on a high pressure processing...
  4. Phil100

    Pump Seal flush coolers

    It appears that you are getting deposition of hardness salts from your cooling water onto the exchanger surfaces. This is a widespread problem the world over...companies such as Betz Dearborn and Nalco make a living curing such problems by having technical service people sample and treat cooling...
  5. Phil100

    Anyone familiar with installing gas

    I can reinforce what pmover says in terms of ensuring that the suppplier validates the conditions under which the turbine will operate. A further point I would make is to ensure that any implications relating to noise and vibration are taken into consideration...not only local personnel but...