Thank you very much.
If this was a permanent facility/plant install and pumps running steady state, then it would be engineered 100% and focused on pump efficiency; however we run remediation systems intermittently depending on type of project, whether we're treating with coagulants/flocculants...
Greetings; I install (typically) temporary water remediation systems.
Scenario:
12 qty - 21k temporary holding tanks (Baker Tanks; Frac Tanks, etc…);
6” mid-low tank outlet ports feed (via hose or pvc pipe) a common 6” pvc manifold about 80’ long in front of tanks providing pump inlet suction...
Sizing my centrifugal pumps for treatment train systems I tend to overestimate TDH, and need some tips please.
We utilize various components in series such as sand filters, bag/cartridge filters, adsorptive mix media filters (Granular Activated Carbon), static mixers, etc… I typically...