Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. SJBombero

    Bar Rail V ASCE T-Rail

    Chips flaking off the top rail is unavoidable. For cleanroom applications solutions are to provide upturned channels under the rails to capture flakes and magnets near the rail head. ASCE rail is a better choice if future adjustment and repair are concerns.
  2. SJBombero

    Revisiting Structural Engineering as a Profession vs Trade (Reboot from 2019)

    I'm coming in late to the discussion but I would like to revisit the definition of profession: A profession is work where compensation is dominated by knowledge rather than effort AND the the professional bears continuing responsibility to his client after the work has been completed...
  3. SJBombero

    What is this weld doing?

    No slot weld. That is the symbol for a backing bar.
  4. SJBombero

    Does ACI 318-19 have a PCA Notes

    From what I understand, PCA passed the baton to CRSI. They have a design guide for 318-19 https://members.crsi.org/ItemDetail?iProductCode=DG0014-01-PUB-I&Category=DESIGN&WebsiteKey=02699be0-de91-4daf-885b-af2284ae09c0
  5. SJBombero

    Alternate Weld Type for Weld Between Round Toe of Rolled Section & Plate

    It would be an overhead weld but the cover plate could be narrower than the width of the existing truss bottom chord.
  6. SJBombero

    Tall ICF wall...

    There are many ways to detail the ledger connection for a more rigid connection to the concrete that would provide adequate out-of-plane resistance. The Simpson connectors seem marginal for that purpose. I would lean towards a detail that uses an embedded anchor bolt and purlin anchor.
  7. SJBombero

    is there such thing as a part time structural engineer

    There is a company here in CA that recruits part-time engineers. I wouldn't expect it to be very difficult to find other similar opportunities as long as you are capable of completing projects without guidance and supervision.
  8. SJBombero

    Looking for opinions on buying out my MEP company

    I recently bought a business. We do consulting and fabrication. My recommendation is if you like the work you are doing, buy the business but hire an accountant to make sure the deal is equitable. It is a long process between signing a letter of intent and closing on the business. However...
  9. SJBombero

    ASD factor on seismic

    Correct. But the LC your are using is oversimplified. You need to check 2.4.5 for the full load combination for seismic effects. You are only allowed to use 0.6 DL to counteract seismic and you have to subtract vertical effects from that. So in significant seismic zones, you only really get...
  10. SJBombero

    ASD factor on seismic

    'E' as derived using Ch. 11, 12, 13, 15is calibrated to LRFD load combinations which is why those combinations do not have a factor in front of the 'E'.
  11. SJBombero

    Development length for drilled and grouted reinforcement

    It's a fairly common detail. The failure between the grout and concrete is covered by the manufacturers data sheet that claims the bond will be at least as strong as the shear strength of the concrete.
  12. SJBombero

    LRFD Wood Design

    True, but fundamentally you still comparing stress by means of safety factors. The only real difference is that the safety factors used for LRFD are based on a different statistical model. The AISC Design Guide for torsion for example, shows you how to compare demand stress to capacity stress...
  13. SJBombero

    Complete penetration welds

    The type of CJP is determined by considerations of economy, access and edge geometry. For some connections, any type will work but some would obviously be more economical than others. Some fabricators have processes setup that would make them prefer one type over another. I have read...
  14. SJBombero

    Rigid Diaphragms

    Option b isn't a semirigid analysis unless the beam/diaphragm stiffness is modeled.
  15. SJBombero

    RFEM (Dlubal) question

    Unless you have a wildly complex structure, FEM is not going to save much time on timber design. The resource intensive portion of a timber design is going to be the design of the connections. Very few FEM programs touch this portion of the design.
  16. SJBombero

    Wood Parapet Detail with Straps only

    This is generally what I have done. https://files.engineering.com/getfile.aspx?folder=ee310ba1-3e78-468c-99cd-7dbf5ce70fef&file=[Untitled]_2022111707582117.pdfhttps://files.engineering.com/getfile.aspx?folder=ee310ba1-3e78-468c-99cd-7dbf5ce70fef&file=[Untitled]_2022111707582117.pdf
  17. SJBombero

    Wood Parapet Detail with Straps only

    Have you looked at using threaded rods with a 2x6 or 2x8 parapet to restrain the overturning? I've been able to make that work before.
  18. SJBombero

    L shape Building Diaphragm Tension Straps

    This was always a concern in the back of my mind when designing large irregular wood diaphragms for seismic loads. Our typical practice was to model it as a rigid diaphragm. However there was typically no consideration given as to how the forces would get from one side of the L to the other.

Part and Inventory Search