Hi all,
I am working on a pump system based on the 2 configuration shown in the attached sketch. I have a question that I hope you can help clarify.
For Sketch 1, which shows a parallel configuration, I understand that the pressure at Point 3 will match either P1 or P2, depending on which has...
Hi MintJulep
If you look at the attached photos, you can see there are 2 holes, one at the inlet and one at inside the PICV chamber, not the outlet, so I also assumpt that there are P1-P2.
Hi All!!
I am working with Danfoss PICV valve for a Chiller system. I have a question and hope you can help me by explaining it to me. Thank you so much!
Photo of the DN25 PICV as bellow link...
Hi@LittleInch
Thank you so much for the reply. I am sorry for abbreviation.
The followings are all I got now:
- The pipe size is DN300.
- For the top of the Syphon, I guess the Cold Basin of Cooling tower is higher than the top of the Syphon. This is just the information from the Client. We...
Hi all
I am the new member. I think this forum is very useful for an new engineer like me.
I have a question, please help to clarify for me.
We are conduct balancing for a chiller system. There are 3 Cooling tower but one CT, the suction pipe one of 3 CT has a one trap pipe as below:
I have...