You should refer to Project specifications provided by your respective client. Within the same, you will find all required codes w.r.t to your design: "ex. piping specification, material selection phylosophy....etc"
All project documents shall be provided to Contractors/Subcontractors as a...
Such questions without details will have useless answers. Indeed, Projects execution relies on Client/Contractor stringency w.r.t quality and safety requirements; as remaining construction aspects are manageable interms of progress boosting up to any extent required.
Though progress is an...
Your inquiry has conflict with your attachments; as you are requesting to calculate strength for steel pipelines and your enclosed attachments are indicating PVC material. In this sense, referring to your att. "PVC Material"; kindly find the below answer for your inquiry:
Collapse Strength of...
Already i've replied in the previous subforum.In this regards, i totally recommend in not doubling your post question in various Subforums. Besides, pls refer to the below answer for your inquiry:
bolting and gasket insulation kit is recommended. Pls refer to the below website...
bolting and gasket insulation kit is recommended. Pls refer to the below website: http://www.corrosionservice.com/docs/Flange
Insulating Gasket-TYPE E:
Type E is a full-faced gasket with
the same outside diameter as the
flange and precision cut bolt holes.
This design facilitates proper...
Back to the initial question; whether testing is required or not. For sure & 100% is certainly required for all flange jts connection (i.e flange-flange, flange to blind flanges).
Note: testing done at Fabshops is to prove the integrety of shop welded jts; whereas, testing done at site is...
Referring to the initial inquiry; i suggest the below steps to be followed inorder to clear such dispute:
1- During 1st & 2nd pass submittal phase; it is clearly indicating that afformentioned submittals are not finally approved/approved with comments. Thus submitted documents will be be...
During Welding Procedure Qualification;measuring heat input is a mandatory record for generating & validating required measurements that let your PWPS qualification succeed with subject parameters. Furthermore, subject records will be your margin reference during welding operations; as the...