  1. emjpete

    Breaker Inspections

    Would you consider the timing of a breaker to be a critical part of a breaker inspection to be in compliance with osha 1910.269 App E? If you can't prove the opening time of a breaker how can you be in compliance with 1910.269?
  2. emjpete

    VACUUM BOTTLE TESTING

    Has anybody written a set up procedure for using the Hipotronics 7BT60 that they could share with me? I have to write one up but Hipotronics doesnt have a manual for the set up. I know its a simple process but would like to see what other utilities use for a procedure. Thanks
  3. emjpete

    ITE 15 HK 500 racking procedure

    What do you fell is safer in racking in a 15HK500 bkr. 1. Control power fuses in and door shut, racking Bkr all the way to connect.mind you springs charge when you reach test. Or 2. Racking breaker in with fuses out and after reaching connect, open door and install control power fuses. Springs...
  4. emjpete

    main body of transformer head space piped to head space in LTC compartment

    Nope. selecter and reversing in the same tank. Cant believe it either. Trying to get a feel to what the rest of the industry thinks
  5. emjpete

    main body of transformer head space piped to head space in LTC compartment

    Has anyone ever hear of connecting the head space of the main body with the head space of the LTC compartment because the board leaks between the two spaces and this will let that oil flow back into the main body from the LTC compartment. Sound kind of rouge to me!