Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Kottam

    fire water monitor design

    Hi Gerhardl, Thank you for your reply. I completely agree with you. But how I can evaluate the air velocity which is function of the pressure pushing the air and length of the air filled pipe. Is there any rule of thumb to evaluate the air velocity ? Regards, RK
  2. Kottam

    PSV vs HIPPS on fuel gas supply line of Centrifugal Compressor

    Hi, I want to design vaccum breakers/Air releave valves at high elevation points of the offshore platform fire water system. I would like to know is there any guide lines to design these breakers to avoid column seperation. I am looking for the following details. 1.how many number of breakers...
  3. Kottam

    fire water monitor design

    Hi, Thank you for your reply. The monitor itslef is orifice and act as ARV. DO you think desgining of ARV at monitor will suppress the water hammer pressure?
  4. Kottam

    fire water monitor design

    Hi All, Fire water system of the offshore platform designed with monitors. The monitors are located away from the deluge skid, the piping between the akid and monitor is air filled. It is observed water hammer pressure during air evacuation from the system. what kind of pressure mitigation...
  5. Kottam

    Vaccum breakers design

    Hi All, I am doing the dynamic simulations for the fire water system of the very big offshore plotform. I have evalauted that there is chance of high pressure surges due to column separation at sevaral high points. My question is, how can I evaluate the number vacuum breakers required and...

Part and Inventory Search