Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: kkr90
  • Order by date
  1. kkr90

    dead load anlysis in staad pro

    if i am giving only dead load then how the selfweight of the member is applied on structure. Even if i am using truss members at dead load analysis each members shows shear and bending moments.can anyone explain the meaning of applying dead load.
  2. kkr90

    what is the meaning of master slave

    what is the meaning of master slave connection in staad pro and why it is used. is it always necessary to use that. can anyone please brief it with an example.
  3. kkr90

    nature of job for geo technical engineer

    thank you sir....yours works are valuable......
  4. kkr90

    nature of job for geo technical engineer

    hello oldestguy what is the nature of your job sir ....either designing or execution..... as a geo technical engineer wat is the scope in the research field.....
  5. kkr90

    nature of job for geo technical engineer

    After spending 2 years of work as an site engineer i wish to do my m.tech in geo technical and geo environmental engineering . I want to know the career oppurtunity that i have aftermath of course completion and also nature of work apart from teaching.
  6. kkr90

    shape of pile cap

    hi, i Want 2 know is there any softwares available for geo technical engineering..........like staad pro and sap for structural engineers
  7. kkr90

    shape of pile cap

    thanks for yur valuable reply....
  8. kkr90

    shape of pile cap

    hi, I have seen many times the shape of pile cap is always curved in the end i.e..facing the water side.is it releated to the structural load transferring mechanism or it is for making the water 2 flow freely..
  9. kkr90

    air pressure inside bored piles

    hi, I have seen that during placing of concreting using tremie in bored pile they are placing a air pipe or vent pipe in the hopper to allow the flow of air and i had also seen many times air coming out from the pipe,my doubt is how air struck inside the pile when it is full of bentonite...
  10. kkr90

    air lifting technique

    what i came to know from the field is while concreting (bored cast-in-situ pile)using tremie pipe if the concrete does not go through or if it get struck up in the middle of concreting they call it as a choking ours is 1.2 m dia,and depth is 45m
  11. kkr90

    air lifting technique

    thanks for ur reply sir , can u explain about the causes and reasons for choking in the piles? and also explain about the remedial measures for it
  12. kkr90

    air lifting technique

    hi, some one explain the process of air lifting technique in piles and why it is used &how to do that
  13. kkr90

    sand collape

    In our site our water table is at a depth of 2.5 m,one time during placing of concrete the bentonite solution oozes out from the near by soil,is this a condition of presence of artesian ,and also we are using auger for boring and bucket for removing.and the client was not interested in augered...
  14. kkr90

    sand collape

    sir thanks for ur valuable reply ..if the sloughing is occurs in range of 32 m why it cannot be removed at the time of flushing,and because of caving the amount of concrete should increase but we kind of saving concrete ...we are using bentonite solution for flushing.the worst part is that we...
  15. kkr90

    sand collape

    thanks for ur reply sir,our's is auger boring,and the depth is 41m below the cut off level,we are placing concrete by tremie method,and the geo-report is as follows 0-1.5m=sandy clay with gravels 1.5-6m=stiff brown sandy clay 6-10.5m=stiff greyish sandy clay 10.5-18m=dense blackish silty sand...
  16. kkr90

    sand collape

    hi, I am kartik,currently I am working in a bridge construction (piling)whenever we are doing the piling,we kind of saving 2 or 3 m3 than actual I don't know whats the problem ,somebody saying it is because of collapsing and i am not sure about that.our pile dia is 1.2m and we are using 1 piece...

Part and Inventory Search