kkr90
Geotechnical
- Apr 1, 2013
- 17
hi,
I am kartik,currently I am working in a bridge construction (piling)whenever we are doing the piling,we kind of saving 2 or 3 m3 than actual I don't know whats the problem ,somebody saying it is because of collapsing and i am not sure about that.our pile dia is 1.2m and we are using 1 piece of 8mm and 7 pieces of 6 mm,help me to figure this out ,and also i want the details of bucket dimensions
I am kartik,currently I am working in a bridge construction (piling)whenever we are doing the piling,we kind of saving 2 or 3 m3 than actual I don't know whats the problem ,somebody saying it is because of collapsing and i am not sure about that.our pile dia is 1.2m and we are using 1 piece of 8mm and 7 pieces of 6 mm,help me to figure this out ,and also i want the details of bucket dimensions