    Alloy 20

    I have a job design that requires the welding of Alloy 20 to SA106B pipe. The processes that I will be using to qualify the procedure is GTAW / FCAW. I will be using a ER320LR wire for the GTAW. What is recommended for the FCAW?
  2. MrRedfish89

    80 Series Electrodes

    Can anyone tell me what the SMAW stick rod equivalent is to GTAW wire ER-80S-Ni1?
  3. MrRedfish89

    ASME Nameplate

    Thank you!
  4. MrRedfish89

    ASME Nameplate

    In regards to an ASME pressure vessel nameplate with a NB registration number, is the ASME / NB marking REQUIRED to be made with the stamp or can it be engraved on the plate? I am required to use 316L on these nameplates and the thinnest material they can use is 20ga. The stamps will not leave a...
  5. MrRedfish89

    QC Start Up

    Let me ask this again in a different way...... I am quite aware of what goes in a quality plan. I am quite aware of what it takes to build vessels. I am quite aware of ASME requirements. I am quite aware of all QC aspects of building vessels. I am asking if anyone has a steel mfg. quality plan...
  6. MrRedfish89

    QC Start Up

    This I know weldstan, I have this already. I was asking for a Quality Plan.
  7. MrRedfish89

    QC Start Up

    Hello everyone......I am starting up a new quality program for a small vessel fabrication shop. I am in need of a quality plan. If anyone would be willing to share an example or written plan, I would be greatly appreciative!!!!
  8. MrRedfish89

    Pressure Vessel Documentation

    Our company manufactures small jacketed pressure vessels that are used all over the country. At any job completion stage, I am required to supply a MDR or Data book to the client. In the MTR section of the book, I have been inserting MTR's for every piece of material used on the vessel. In...
  9. MrRedfish89

    Authorized Inspector (AI) Inspections

    As an commissioned AI, he should be able to review provided drawings and recognize whether or not the vessel is designed per ASME and then then through periodic inspections and hold points, ensure the vessel is fabricated and tested per the drawings. Our company PE generates these calculations...
  10. MrRedfish89

    Authorized Inspector (AI) Inspections

    I work as a QC Manager for a company that manufactures jacketed pressure vessels. When I schedule a inspection with my AI to review a new job, he insists on reviewing my vessel calculations page by page, and requesting changes when he finds a mistake. I have no problem providing him with the...