Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. MECE23

    VRLA in Class 1 Zone 2 w/ Type Z Purge

    Yes, the hydrogen emission seemed to be very small for the size of the Cabin (8x20x9.5). But we have a 9Kva UPS and about 15 backup batteries (60min backup required). So with that many batteries it became more of a concern than having just 1 or 2. The cabin IS a manned space, at all times. Thus...
  2. MECE23

    VRLA in Class 1 Zone 2 w/ Type Z Purge

    Hello All: I have a control cabin in a NEC 505 Class 1 Zone 2 Area. The cabin is Type Z purged per NFPA 496 Upon loss of purge i can still run equipment, i just have to monitor the environment. If i lose purge i am likely now on UPS battery power. The question is, if the VRLA's are inside the...

Part and Inventory Search