  1. ceasar20

    Close interval potential surveys (CIPS)

    we will make 6 ground bed . every ground bed have approximately 8 anode spacing 15 m and his test point.
  2. ceasar20

    Close interval potential surveys (CIPS)

    the Number of anode (Mg) 50 Spacing 15 m Anode Net Weight: 7 Kg Soil resistivity in ohm-cm 30000
  3. ceasar20

    Close interval potential surveys (CIPS)

    thank you expert for your helps
  4. ceasar20

    Close interval potential surveys (CIPS)

    Dear Expert, we are working on construction pipeline project (2km), I want to know if the Close interval potential surveys (CIPS) are mandatory or not ? Type of cathodic protection: sacrificial anode. Coating type. 3LPE Number of test Point 6. Thank you in advance for comments.
  5. ceasar20

    Pipeline lowering with 2 crane

    Of course No, total length is 300 m , I will lower every 30 m. I need recommendations.
  6. ceasar20

    Pipeline lowering with 2 crane

    Hello Mates, we will start the activities of Pipeline lowering (L 300m D 12 inches thx 8 mm X 52 trench depth 1.70 m ) with two cranes every crane have 2 lift points. I want to ask about: Two cranes are sufficient? Recommended distance between lift points ? The distance between...
  7. ceasar20

    welding activity pipeline

    Hello ; We work for welding activity pipeline 12” X52 thickness 8.38 mm Root / hot pass GTAW Filling / cap SMAW In order to optimize production Contractor propose to proceed with GTAW first , for example for he weld first 10 weld joint GTAW after that he...
  8. ceasar20

    Leak ball valve issue

    hi, Thanks mates , i will try to change again the gasket and lips , i will add locking past ( loctite ). If it does not work , some damage occurred and i hope to get provisional solution before replace it . BR
  9. ceasar20

    Leak ball valve issue

    Dear mates , After first leak test with helium we was found leakage in valve 24 inch (from 20 bars ) between nut and stud (pos 21& pos 22) see attachment . we changed the lip seal (pos 24 ) and the graphite gasket (POS23) but the leakage persist . service pressure of valve : 80 bars...
  10. ceasar20

    Insulating joint (cable lugs)

    already included in our data sheet . BR https://files.engineering.com/getfile.aspx?folder=1150b8c8-82cf-4039-ac21-3ceafaffa5e7&file=ij.pdf
  11. ceasar20

    Insulating joint (cable lugs)

    Yes SJones ,full length internally coated
  12. ceasar20

    Insulating joint (cable lugs)

    dear all, in order to connect surge Surge Diverter , its possible to add and weld cable lugs on pipeline insulating joint (thickness 8.6 mm) ? thanks in advance