  1. amustha1407

    EROSIONAL VELOCITY CRITERIA

    Hi, For natural gas,i usually limit the velocity to 20 m/s at the smallest segment. But this is usually to avoid corr inhibitor ineffectiveness instead of errosion. You may also want to check for flow induced vibration limitation (usually meassured as dynamic pressure, or Density x...
  2. amustha1407

    Blowdown Initiated by Flare KOD LSHH

    Hi, Recently i am assigned to be seconded to another oil and gas company. This question may be just resulted in Different company standard, but i am really curious about the philosophy behind it. So far, what i encountered in oil platform, LSHH at flare KOD (Knock Out Drum) will initiate...
  3. amustha1407

    Automatic Platform Blowdown During Simultaneous Operations With Drilling

    Dear MortenA, Thank you, that is exactly what we are facing now. We are converting this unmanned, with burn down philosophy platform to temporarily "manned" platform. We already resolved other requirement, like fire fighting system, ignition source control, POB management, Emergency evacuation...
  4. amustha1407

    Valve Sizing

    Hi In my opinion, Liquid thermal expansion is a condition resulted from direct solar radiation contact while the segment is blocked. Usually the expected temp from solar heating is up to 70 oC only (so the P increase and relied flow will correspond to volume increase of your liquid from its...
  5. amustha1407

    Flammability of fuels

    Hi, UFL 100% volume means that even without air or any oxidizing agent your component will explode. This is usually represent a very unstable gas /vapor like acetylene. UFL usually stated in % volume of gas in air. Correct me if this is wrong, but If your UFL =100% then your LFL is also 100%...
  6. amustha1407

    Fusible Plug Loop Using Instrument Gas

    LittleInch, Thank you for your guidance. This helps
  7. amustha1407

    Automatic Platform Blowdown During Simultaneous Operations With Drilling

    Hi, We have an old unmanned platform that are going to be used to develop new well, so we will have drilling come next year to our platform. The thing is, this platform was designed unmanned and the blowdown is designed to be manual (by PB or remote from onshore). Some of my friends thinks...
  8. amustha1407

    sprinkler system vs deluge valve system

    Hi, My understanding is, Deluge valve will open (literally the valve will open) upon detection of fire or manual initiation. Water will comes out on each nozzle on the respective fire area. For Sprinklers, each sprinkler will be equipped with heat sensitive element. Upon any sprinkler elements...
  9. amustha1407

    SDV/BDV/PSV mechanism

    Hi, Just to add, 1. The SDV actually have something to do with the BDV opening. Blowdown are normally devided by sections. Both SDV downstream and upstream the section to be depressurized shall be closed first before BDV open to avoid overwhelming the flare system with the full flow of the...
  10. amustha1407

    Fusible Plug Loop Using Instrument Gas

    Hi, We are designing an unmanned remote wellhead platform. Due to economic reason and remoteness we are having trouble to place instrument air compressor on the platform and hence plan to use instrument gas. On such case, is it OK if we pressurized the fusible plug loop with instrument gas? It...
  11. amustha1407

    corrosion monitoring

    The idea is have representative data for the whole flowline/pipeline/plant segment. The distance between the two will be more of a operability and layout issue. I would suggest the following partice: - Provide both downstream and upstream the injection. Any distance is OK as long as you think...
  12. amustha1407

    Alter exisitng heat exchanger conditions

    On such condition where there are too many unknown parameter, I would suggest to plot the UA for various time first. If you have sufficent historical data with fluctuation, you will get understanding on how different deltaT affect the efficiency. If you think the correlation obtained above is...
  13. amustha1407

    API 14 C /ISO 10418 FSV in flow lines

    Hi, Please correct me if i am wrong. The purpose of the check valve there is to avoid back flow when you have a leak on your flowline. Flowlines are prone to leaking, since they are located at the upstream side of the process due to errosion (multiphase flow at high rate) and corrosion (higher...
  14. amustha1407

    Who owns the operating procedures and prepare them?

    Different companies has different practice in developing their operating procedure. Personally, i can not see the benefit of developing higher level procedure which then be detailed by other procedure. The procedure itself should be clear and adequate to help an "apprentice-equivalent" operator...