Hi guys.
As part of my infrastructure to prevent power theft by customers connected to our power network, I want to install 50Hz to 5Hz frequency converter at my 11kV/400V main power distribution transformer transformer and also a 5Hz to 50Hz converter at the customer's premises integrated with...
Hi guys. Thanks for the good works. I continue to learn some here.
I will appreciate any information on Tamper- and Bypass-proof residential/commercial meters for power metering.
Major problem client has is that consumers bypass their meters so as to enjoy free power. This has cost the client...
Hi guys. I am studying the impact of condensate coloration due to the presence of gum on process equipment, with a view to providing a lasting solution for affected plants. This is because the condensate is spiked into the gas stream and transported to the gas processing facility where the...
Hi all.
I am interested in solutions that can use natural gas condensates liquids produced by our gas plant as fuel for power power generation gas turbines.
The gas plants of interest are currently in operation and export up to 150million scf of gas per day and produce up to 10 thousand...
Both posts thus far are spot on. Typically,when the flare tips have degraded, or there is change in service conditions or composition of the flared gas,then you will have incomplete combustion indicated by black smoke.
The reason for the change must first be understood. So check condition of...
Hi all.
I am interested in solutions that can use natural gas condensates liquids produced by our gas plant as fuel for power power generation gas turbines.
The gas plants of interest are currently in operation and export up to 150million scf of gas per day and produce up to 10 thousand...
All, happy new year.
In one of our remote facilities, the gas genset providing power supply is rated 156kVA, while we intend bringing in a new Atlas Copco GA37 air compressor(rated 37kW) for provision of instrument air to the facility. The base load in the facility is about 40kW, while the new...
I would bring in the original equipment manufacturer to help with a pre-start up audit, integrity checks and replacement parts list from the audit/integrity checks. The OEM engineer can then:
- together with your maintenance team prepare a repair plan
- together with your operations team prepare...
Happy New Year all!
We recently replaced a section of a 12'' duplex stainless steel natural gas pipeline, which required us replacing a 2m spool and welding two joints.
Because of the length of the line (12km) and the volume of water that will be required, we have decided to treat the 2 welds...