One aspect I've been looking into was construction of the TTC buttress wall re-initiating settlement of the MT. Given the problems SGH has had with installation of the new piles accelerating settlement again, construction of the TTC buttress could be linked as well. The attached...
@epoxybot
You are an amazing individual and I cannot thank you enough for your work documenting this debacle.
I spoke with Larry this week about the website and he said his server is down but should be up in a few days. I’ve been using the waybackmachine to get archive copies of things until...
@epoxybot
I'm working on my geotech masters and exploring the MT case history. Could you help clarify some questions I have?
Does the old/new PGE vaults referenced in your diagrams run the entire length of the cantilever slab?
Was the old PGE vault removed or just abandoned in place?
Is the...
epoxybot - Were you ever able to come across any foundation and basement plan sheets for the Millennium Tower you could share? Some of the older links in the original thread are dead.
Hi guys,
The current situation is a large circular storage tank (oil, 200 feet in diameter) is to be placed over a large cut (30+ feet) in overconsolidated clays below the water table (25 feet). We are still waiting for lab testing to be finished, and the structural guys are looking for...