Thanks for reply. Will use Pecaform to cast both pile caps. May I know the requirement for the gap between 2 pile caps? It that appropriate if we cast 2 pile caps close to each other?
Looking for opinion:
Hall call button for a lift is 300(h)x150(w) and it located on junction of rc wall and rc separated beam, both are 230 width. Before concreting, when I inspected reinforcement, spacing 2 rebars with 20mm dia. left 100mm only. How can I fix it?
Can I just concrete the column till height of beam with G30 together with beam eventhough column required G40? My consultant want us concrete separetely column till height of beam with G40.
Vertical member like column and wall G40 while hor. Member like slab and beam G30.
How to cast beam? Is that possible to cast beam and column's rebar together?
I will use mobile crane to drop concrete to 2.6 m deep pile cap. My workers will vibrate each lift of 12" thick concrete with 6" inside lower lift of concrete.
My question is how many drum (0.7 cu.m/drum) should I drop before I need to start vibrate? Can I just fill out 12" thick of the pile...
A pile cap with L shape will be constructed. Tie bar in Internal corner will always split and extent into pile cap with lapping length. I understand that the tie bar is useless if I am not doing so. Why and what this rebar/ fenomena called?