Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

Search results for query: *

  1. Ebyate

    Mass flow rate from an opening in a pressurized cylinder

    Would appreciate if anyone could help me to find the mass flow rate from a 4" opening from a cylinder that is pressurized with air at 5 bar . The size of the cylinder is 24" and length is 600 mtr
  2. Ebyate

    Hot alignment & Motor run test

    motor run test
  3. Ebyate

    Hot alignment & Motor run test

    Hi, Would like to know if Hot alignment is done first before MRT or done after thanks
  4. Ebyate

    Cleaing Force Ratio - Pre commissioning

    We are doing typical to what you mentioned pressureize line and blow it off. As it piping, we can't run a pig due to tee and short radius elbow. Generally all piping are typical air blown to remove dirt or particles in the line. What can be inferred from the equation is that when the line is...
  5. Ebyate

    Cleaing Force Ratio - Pre commissioning

    Crf formula = M^2(blow)* Volume(blow) / M^2 (design) *Volume(design) Diving the pressure would not be same as the flow in piping reduces with increase pressure. It basically to compare the flow rate
  6. Ebyate

    Cleaing Force Ratio - Pre commissioning

    What we do is typical to blow disk but here we use QOV (quick opening valve) and run the operation couple of time till no dirt is obtained. The only calculation they are looking for is to understand is the pressure applied is sufficient enough.
  7. Ebyate

    Cleaing Force Ratio - Pre commissioning

    We are carrying out air blowing with Quick valve opening in the piping system. We fill the line to 5 bar and then open the valve. Now client is asking to show the CFR calculation to ascertain the force is adequate enough to clean the line. While reviewing the CRF equation, it is flow rate...
  8. Ebyate

    bolt stress on flange

    when i am testing a 18" pipe at 150 bar, how to calculate the stress that will be acting on the bolt. Say the flange is 18" 600# which has 20 bolts
  9. Ebyate

    DEP clarification regarding PSV testing/Calibration

    DEP 61.10.08.11 - Gen Field Inspection states to carry of site testing of PSV prior to installation. Is there any clarification that the word "site" is not be read literally as physical project site but could be carried out at approved workshop in the project location/city
  10. Ebyate

    DEP Construction Class - B31.3

    Can anyone share the details of DEP construction class classification
  11. Ebyate

    Socket fabrication from A36 MS plate

    Thank you all for the reply. What I require is 41mm and the particular size isnt available in the country I work. It will take atleast 3 weeks to procure it. Hence I was looking at the option to fabricate it from A36 plate.
  12. Ebyate

    Socket fabrication from A36 MS plate

    Since there a non availability of a particular size open type socket readily in the stores, I am contemplating to fabricate the same from the subject plate. I would to have your opinion/advise if the plate will withstand when 350 Nm torque is applied. The socket will be connected to 3/4"...
  13. Ebyate

    Socket fabrication from A36 MS plate

    Since there a non availability of a particular size open type socket readily in the stores, I am contemplating to fabricate the same from the subject plate. I would to have your opinion/advise if the plate will withstand when 350 Nm torque is applied. The socket will be connected to 3/4"...
  14. Ebyate

    socket fabrication from MS plate A36 grade

    Since there a non availability of a particular size open type socket readily in the stores, I am contemplating to fabricate the same from the subject plate. I would to have your opinion/advise if the plate will withstand when 350 Nm torque is applied. The socket will be connected to 3/4"...
  15. Ebyate

    sensitive leak check

    My understanding of service leak check is with product and not air/nitrogen. As mentioned, during pre commissioning we are anyhow carrying out leak check with bubble check for the whole system. Doesn't that meet the criteria of sensitive leak criteria . Currently we carrying out so called...
  16. Ebyate

    sensitive leak check

    I do agree that all safety measures needs to be checked before putting the system in service. Normally in the plant system, we carry out hydrotest and then as part of pre commissioning a leak check of the system is carried out at operating pressure ie combination of many hydrotest packs to...
  17. Ebyate

    sensitive leak check

    Even if it is in the procedure, we can request for waiver. Is there was any technical justification required to be carried out for the weld joints in a piping system
  18. Ebyate

    sensitive leak check

    Our client is requesting to carry out sensitive leak check for fluid category M as per section B31.3 section 300.2 and appendix M after hydrotest of the line. The line is hydrotested at 100 bar while the sensitive leak check is carried pneumatic at 2 bar . Could anyone explain what is the...
Back
Top