    MEA Triazine based H2S scavenger in process stream, plant issues

    Hello, Thank you for the reply. There is no filtration upstream. I will check out Hexion. Cheers
  2. AlbertaCA

    MEA Triazine based H2S scavenger in process stream, plant issues

    Hello All, Our facility is a natural gas processing plant. We have many inlets with gas, condensate, and water coming in from the field. In the past year, we have noticed plugging of the condensate Stabilization system, specifically the trays on the Stabilizer tower. This caused a shutdown...
  3. AlbertaCA

    Two process refrigeration systems working together controls?

    There is no hot gas BP around the CW condenser, or will be. On thing I have found out is our new receiver pressure will be 1300-1400 kPag (winter-summer). For simplicity I only put down two chillers. The duty in the existing system is 4500KW @-15, which does fluctuate in the summer and winter...
  4. AlbertaCA

    Two process refrigeration systems working together controls?

    Yes to your first statement. I was still drawing it up. There will be no balancing line between the two receivers, nor a over head line. C3 v2
  5. AlbertaCA

    Two process refrigeration systems working together controls?

    Hello, I've tried to attach drawing, hope it works. Pipe sizes; 24" suction 6" C3-liquid 4" hot-gas
  6. AlbertaCA

    Two process refrigeration systems working together controls?

    Thank you, those are good points. We have most of them worked out, or planed on paper (studied). The part I'm trying to work through is the controls. One system is three centrifugal compressors the other system will be two screw 1600 hp. They'll be two hundred meters apart, with the chilling...
  7. AlbertaCA

    Two process refrigeration systems working together controls?

    Hello, We are planning to install a second refrigeration plant. It will work with the other one, sharing the same vapor, liquid and hot gas lines. It is a propane refrigerant system. Has anyone worked or is working on a similar system? What are some of the things to note? I can not find much...