I was wondering, do any counties/municipalities require Contractor's bidding for City jobs to require any erosion control certifications?
Many counties are placing a greater focus on environmental protection/bmps/npdes, etc and responsibilities on their staff for contractor oversight, I was...
Thanks for the responses guys. After further review, the "y" cuts and mag nails are temporary bench marks specific to our projects to locate the new drainage system being installed. They will be removed during the cold planing process. We will preserve the existing street monuments located in...
Sorry guys if this is a repost. I posted this in the survey section also but thought it may be more appropriate here.
Most counties I believe have a standard spec or procedure on how the Contractor should preserve, protect, or replace a survey monument in case it is disturbed or damaged during...
Most counties I believe have a standard spec or procedure on how the Contractor should preserve, protect, or replace a survey monument in case it is disturbed or damaged during repaving procedures. Typical street monuments are embedded into the ground 3+' so it will be difficult to disturb the...
Would you wait until you receive the compressive strength test results before paying the Contractor 100% of concrete or shotcrete work? Our city specs are not very clear on this section. Some say pay a portion some say wait until the results pass the spec requirement. The work is completed in...