cdafd,
For my project is Roll Paper Warehouse and I still not sure to select to be wet or dry system.
UFT12,
Thank you very much for your advise, I will appoint meeting with the owner and discuss with them for this issue about their Insurance and also AHJ.
Hello,
Now, I'm study NFPA 13 about storage occupancy and I'm not understand that mention in NFPA.
Refer NFPA 13 about storage occupancies
12.4* Wet Pipe Systems
A.12.4 Wet systems are recommended for storage occupancies. Dry pipe systems should be permitted only where it is impractical to...
TravisMack
Thank you very much for your advise.
LCREP
Thank you very much for your advise.
This building alomost are production area not warehouse , but there are only some area to use for keeping finishing good and raw material.The system is wet pipe sprinkler all buildig and have water...
Hello everyone !
Now, I have a project (factory building more than 10,000 sq.m floor area) that need to be design automatic sprinkler all area , but when I read NFPA13 found that there are ESFR and CMSA sprinkler and I still confuse for the both type.
How to know when we use ESFR or CMSA ...