  1. wayne3298

    Piping over budget

    In my experience cost over runs start with the design engineers proposal for design cost. In the desire to land the job the project manager or principal reduces the cost estimate of the engineer that did the work up. Second was lack of coordination between design disciplines. For example as soon...
  2. wayne3298

    Pumps in parallel vs series - Flow vs head

    Draw a parallel pump curve using actual or proposed single pump curves. Calculate the actual or design system curve and plot it on the parallel pump curve. If pumps are not the same design you can't draw a parallel curve which tells you don't operate them at the same time. Some pump selections...
  3. wayne3298

    Air Causing Problems in Suction Pump Pipeline

    It sounds like you have continuous varying flow conditions. Aside from expensive controls an atmospheric surge if installation permits would solve your problem. The rail cars drain into the surge tank and when the car is empty no air enters the pump suction because the pump is drawing from the...
  4. wayne3298

    Air trapping through suction pipe w

    The easiest way to solve your problem is to install a motor operator on the isolation valve near the pump and one on the isolation valve near where you show the foot valve. On shut down delay the pump shut down until both valves are closed. On start up start the pump and then open the valves. I...