Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

Search results for query: *

  1. Sriniva

    Increasing the Design Pressure for Existing U2 Vessel

    Thankyou very much. Yes. We have a copy of the NBIC.
  2. Sriniva

    Increasing the Design Pressure for Existing U2 Vessel

    Dear A Clark - Thank you very much for the advice. I understand the UDS is to be revised by the end user and certified by PE and AI. Is this correct understanding? Please reply
  3. Sriniva

    Increasing the Design Pressure for Existing U2 Vessel

    The increase in Design pressure is from 48Barg to 48.6Barg
  4. Sriniva

    Increasing the Design Pressure for Existing U2 Vessel

    We are required to relocate an existing Knock Out Drum from one process unit to another process unit. But, the Operating Pressure and Design Pressure requirements are higher at the new location of the vessel. We know the vessel has adequate design margin to meet the new Design conditions...
  5. Sriniva

    External Floating Roof Tank - Need for Circulation Vents

    Dear Little Inch, Thank you very much for the response and the ear bending. Grateful for your consideration, time and expert advise.
  6. Sriniva

    External Floating Roof Tank - Need for Circulation Vents

    Dear Sirs, As a rule we provide Circulation Vents in internal Floating Roof Tanks. Thus we could store liquids having Flash Point close to Storage Temperature without gas blanketing. Thread 1452-360717 discussed this aspect in detail. My Query is: Will API 650- Appendix H Circulation Vent...
  7. Sriniva

    IEC 60529 IP Rating

    I am faced with a problem of specifying the required IP rating for a Project. IEC60529 provides available IP ratings. But how do we choose the right one for the project? Is there a recommended practice or International Code or Standard that will guide me in selecting the right IP Rating for the...
Back
Top