We are required to relocate an existing Knock Out Drum from one process unit to another process unit.
But, the Operating Pressure and Design Pressure requirements are higher at the new location of the vessel.
We know the vessel has adequate design margin to meet the new Design conditions.
However, the vessel is Stamped U2.
The Original Manufacturer is no longer in business.
Can we use a local R Stamp Contractor to recertify the vessel?
What is the process to be followed?
Please guide us