Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. istruct1980

    Construction Joints for post tensioned continous beams

    Where Can I see references regarding construction joints for post tensioned reinforced concrete beams? As stated in ACI, its description excludes prestressed concrete: Thank you!
  2. istruct1980

    Construction methodology

    The construction of the building is subdivided into 2 zones as show in the image. What is the specific construction methodology term is this where the contract plans to construct zone 1 first and then followed by zone 2 later on. I would like to de more research also on this type of construction...
  3. istruct1980

    Recommended references on Dual System(Moment Frame + Shearwall)

    hello, anyone pls recommend a good book or reference that has detailed discussion of using Dual System( Moment Frame and Shear wall) on seismic design of buildings.
  4. istruct1980

    Manual Computation for for structural analysis of Dual System (Shear Wall + Moment Frame)

    Hello. I have found so many manual computations for structural analysis of moment frame as lateral resisting system only. Does anyone of you here knew or found some manual computations for structural analysis of Dual System(Shear Wall plus moment frame)?
  5. istruct1980

    12m canopy steel beam to rc concrete connection

    i think its okay?, just have to add more covering of the top tension bolts.
  6. istruct1980

    12m canopy steel beam to rc concrete connection

    hello am i missing something? the steel canopy is 12m long with a spacing of 6m(column to column distance) loadings shown in the image, and i got these design results: in my computation for bolts required due to resisting moment is only 5 bolts on the outermost layer, what would be the...
  7. istruct1980

    14m canopy steel I-beam to RC column connection

    Hello, Im just curios for designing of steel connection to rc column for long span i beam. i designed several times for canopy steel beam to rc column connection for canopy several times but those are at most 5m span. Im wondering if there area any other considerations for designing of the long...
  8. istruct1980

    15 meters span cantilever reinforced concrete beam

    The frame will look like and inverted L shape, the 15m cantilever beam has no backspan. If it would be possible and it will be calculated/designed properly/safely, is it possible to have splice all along the bars? If this is the case i believe that as much as possible the top bars of the...
  9. istruct1980

    Structural Engineering books where to buy in dubai

    hello im looking for structural design books to buy in dubai. do you know any shop? Im looking for a metric units version of these books, could be any of: Reinforced Concrete Design Structural Steel Design as long as it is in metric version
  10. istruct1980

    Lifting hook analysis and design for Post tensioned AASHTO Girder

    Hello, where can i get references or sample computations for analysis and design of lifting hooks for post tensioned bridge girders
  11. istruct1980

    15 meters span cantilever reinforced concrete beam

    hello, the 15meters cantilever beam is supporting a roof of sports complex arena, i would say there is no back span
  12. istruct1980

    15 meters span cantilever reinforced concrete beam

    does anyone of you designed or knew someone made a 15meters meters cantilever beam which supports only roof? is it even possible?. its not post tension, just conventional beam
  13. istruct1980

    ld required not enogh for 300mm footing thick

    @Agent666 Thanks. I edit my thread i actually mean the other way around, required development length is greater than what was provided.
  14. istruct1980

    ld required not enogh for 300mm footing thick

    Hello, how do you justify this problem where in the minimum development length, ld required for tension is greater than what was provided. the footing is 300mm thick and im using 16mm. the minimum requried ld should be 300mm as stated by most structural codes, for 300mm thick footing it will be...
  15. istruct1980

    ACI The Reinforced Concrete Design handbook (Metric Edition) - Looking for

    Does anyone of you have an electronic copy of this very useful structural design handbook? i have the english version but i cant seem to find the metric version
  16. istruct1980

    Development length, ldh of deformed bars in tensions

    hello, how do you handle this the of problem wherein your computed development length required exceeds the provided length, say the wall support thickness is only 150mm or effective depth is only around 120mm, but the required length is 300mm?

Part and Inventory Search