Thanks David.
The statement that confuses me is the quotation UG-84(h)(2)
"The test plate material shall satisfy all of the following requirements".
The wording "Test Plates", creates all the confusions in my mind.
So UG-84(h)(5) statement says welding procedure shall be qualified by testing sperate sets of impact test specimens removed from weld metal and heat affected zone .
Then how can I use a full specimen? Please explain
When sperate sets of imppact specimens are used for individual process then how...
So UG-84(h)(5) statement says welding procedure shall be qualified by testing sperate sets of impact test specimens removed from weld metal and heat affected zone .
Then how can I use a full specimen? Please explain
When sperate sets of imppact specimens are used for individual process then how...
Hi experts i just want to know what will be the impact temperature reductions per Table UG84.2
(1) Base material thickness is 9.27mm.
(2) Deposited weld metal thickness - GTAW (4mm) & MAW(5.27mm)
(3) MDMT temp. is -31degree Celsius.
In my opinion it will be -50 degree C. is it correct for...
Subject: Qualifying Two Test Processes on One Plate
Code Edition: D1.1:2006
Code Provision: Tables 4.2 and 4.11
AWS Log: D1.1-06-I18b
Inquiry: (1) Can I qualify two welding processes on one test plate?
(2) Do I use the deposited weld metal thickness for each weld process to establish the range...
So when preparing single process WPS from a multi process PQR the deposited weld metal thickness by each process individually considered to determines the base metal thickness?
Here, for GTAW the Base metal thickness for gtaw wps is -5 to 16mm not 5mm to 32mm?
Can we use such a WPS to make weld...
Hello experts pls answer this question,
A PQR was qualified as per ASME SEC IX with two process, GTAW and SMAW with weld metal deposit thickness (t) of 8 mm each in a 16mm base metal thickness (T) of plate. What will be the BASE METAL THICKNESS range T (not deposited weld metal thickness) if a...
Dear experts pls clarify my doubts,
As per asme sec 9 position is not an essential variable for WPS .
Let consider I have a pqr qualified in 1G position as per code I can use that WPS for Vertical position welding but by doing so how can I choose the parameters correctly.
The current range...