Thank you for the detailed explanation. From your calculation shown the below formulation would be suitable...
To calculate cycle time for a continuous production
Loading : 3 sec/12 = .25sec
Testing : 200sec/12 = 16.67sec
Unloading : 3/12 = 0.25sec
Cycle time per part : 17.2sec
But I assume...
Hi,
I have been faced with a challenge at work. I have a testing machine which has an operator to load and unload. After the load the machine operates automatically. Because the machine test time is high and we are unable to meet the Target Cycle time, we have made a machine with multiple...