  1. helathira

    Cycle time for duplicated machines

    Thank you for the detailed explanation. From your calculation shown the below formulation would be suitable... To calculate cycle time for a continuous production Loading : 3 sec/12 = .25sec Testing : 200sec/12 = 16.67sec Unloading : 3/12 = 0.25sec Cycle time per part : 17.2sec But I assume...
  2. helathira

    Cycle time for duplicated machines

    Hi, I have been faced with a challenge at work. I have a testing machine which has an operator to load and unload. After the load the machine operates automatically. Because the machine test time is high and we are unable to meet the Target Cycle time, we have made a machine with multiple...