Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Jyop92

    Gas Scrubber P&ID

    Anybody has gas scrubber P&ID ?? PLEASE SHARE IF YOU HAVE. THANKS
  2. Jyop92

    Pig launcher, receiver and indirect bath heater

    Can anybody please give me information about "minimum distance that need to be maintained between pig launcing area and indirect bath heater" Also, please give information about any standards need to be referred or any calculation. Thanks.
  3. Jyop92

    Why Recirculation line (valve) is p

    Why Recirculation line (valve) is provided in Gas engine driven reciprocating pump ?? ((During which initially the recirculation line is made open and on clutch engagement the recirculation valve is made closed, allowing full flow to go through the reciprocating pump.))
  4. Jyop92

    What is the importance of bath heat

    What is the importance of bath heaters in crude oil farms? What is the difference between direct vs indirect bath heaters ? Can somebody please explain me the engg behind it.
  5. Jyop92

    Pipeline pigging

    Can somebody give me risk assessment during pigging operation.
  6. Jyop92

    HIPPS HYDRAULIC SCHEMATIC

    Can somebody please explain me the hydraulic schematic of HIPPS (HIGH INTEGRITY PRESSURE PROTECTION SYSTEM) broadly.
  7. Jyop92

    HIPPS HYDRAULIC SCHEMATIC

    Can somebody please explain me the hydraulic schematic of HIPPS (HIGH INTEGRITY PRESSURE PROTECTION SYSTEM) broadly.
  8. Jyop92

    Wellhead control panel

    Yes during well startup, when we go to the wellsite to restart why we have to bypass the logic and make it local(manual handling from remote).Please explain me why we have to do this.
  9. Jyop92

    Wellhead control panel

    why is it required to select bypass and local switches during well opening and closing in a wellhead control panel. Please explain me in detail.
  10. Jyop92

    Wellhead or Christmas tree

    Can anybody tell me why during shutdown operation it is always necessary to close the wing valve first followed by master and SSSV valve.Please provide me the detailed engineering about these.
  11. Jyop92

    Adjustable choke valve selection and sizing

    can anyone please tell me how to select and size a adjustable choke valve.

Part and Inventory Search