Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. eschube

    Pipe Capacity Issue

    Ok, I understand, and thank you again for the assistance. I switched the final reach node in my model to a pipe. I did this in order to model the run of the existing system to see this proposed system's effects. HydroCAD was able to produce a message that node 33R peak inflow is 178% of...
  2. eschube

    Pipe Capacity Issue

    @psmart Thanks for the info. My issue really is the fact that typically when the program typically forces the water through the pipe I am used to seeing the error that the culvert has surcharged and am not seeing that here. I see that the flow is pressurized upon reaching a 'flowing full'...
  3. eschube

    Pipe Capacity Issue

    Hey everyone, I would greatly appreciate some assistance with the attached model. Specifically with node R7. It appears that the model is allowing a much larger flow capacity through this run of 12" pipe @ 0.45% than possible. Using Manning's equation, shouldn't the capacity for this pipe be...

Part and Inventory Search