eschube
Civil/Environmental
- Mar 16, 2021
- 3
Hey everyone, I would greatly appreciate some assistance with the attached model. Specifically with node R7.
It appears that the model is allowing a much larger flow capacity through this run of 12" pipe @ 0.45% than possible.
Using Manning's equation, shouldn't the capacity for this pipe be limited to ~2.4 cfs VS the model allowing 4.61 cfs?
I am not sure why this is happening, but the main reason I am concerned is because the downstream system may need resized if the pipe capacity is actually overburdened as anticipated.
Thanks for taking the time to assist!
It appears that the model is allowing a much larger flow capacity through this run of 12" pipe @ 0.45% than possible.
Using Manning's equation, shouldn't the capacity for this pipe be limited to ~2.4 cfs VS the model allowing 4.61 cfs?
I am not sure why this is happening, but the main reason I am concerned is because the downstream system may need resized if the pipe capacity is actually overburdened as anticipated.
Thanks for taking the time to assist!