Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. gregkeez

    Composite Position and Parallelism

    pmarc, To clarify on datum A, datum A is actually established on the forging drawing using datum targets and in this case, is just a reference.
  2. gregkeez

    Composite Position and Parallelism

    pmarc, Thank you for pointing that out. On my actual drawing, that centerline is in fact a section line that the datum is placed on. I'm guessing this is also incorrect?
  3. gregkeez

    Composite Position and Parallelism

    Datum holes are not threaded.
  4. gregkeez

    Composite Position and Parallelism

    Absolutely, I'm trying to learn as well!
  5. gregkeez

    Composite Position and Parallelism

    Thank you for your input! Another question, considering three of the holes have BASIC's from the first hole which has BASIC's to datum B, would I be correct in adding the "SIM REQT" for all the holes?
  6. gregkeez

    Composite Position and Parallelism

    Hello, First time posting on here. I'm working on a drawing with a group of holes that I want to control as a pattern using composite position. In the feature control box, the goal of the second line is to control the pattern's parallelism to the two datum holes. Is this the correct way of...

Part and Inventory Search