Dear Mr. Georgeverghese,
Yes you are right, flow is too small for centrifugal pump. No vendor is quoting for this flow. Max they are asking us to increase upto 6.5 m3/hr.
We are checking if the piping can handle 6.5 m3/hr.
Regards,
Thanks for your response.
I just have the process data sheet & P&ID. Hope this helps.https://files.engineering.com/getfile.aspx?folder=e4c80b79-ba8e-42e2-8015-7d2654fd4d7d&file=Revised_Process_Data.pdf
We require tanker unloading pump to unload Corrosion inhibitor from Tanker to Chemical Injection. Below are details.
As per data-sheet client have asked us to consider self priming centrifugal pump with flow: 3 m3/hr, differential head: 16.07 m, NPSH (minimum): 12.1 m.
Pumping Temperature: 2 to...