Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

Search results for query: *

  1. JakeLong

    ROCOF setting for industrial plant

    Of course, the facility is connected at 10 kV. The ROCOF function should only be turned on the incoming relay which already has this function available. I think it's a way of future proofing the plant. But it might be that the over/under frequency stage is enough in it self.
  2. JakeLong

    ROCOF setting for industrial plant

    Hello, I'm working on a project regarding relay settings for an industrial plant, <10 MW. They are able to supply the plant fully through their syn. generator or through their connection to the grid, or a combination of both. It's been decided that they want ROCOF protection on their incomer...
  3. JakeLong

    Zero sequence impedance of cable

    @wcaseyharman unfortunately this is not the case here, but the document @7anoter4 linked does say it is better to consult with the cable manufacturer on this matter, which I will give a go. Thanks for your answers. Though if they give me the Z0-value of the cable, won't this value only apply to...
  4. JakeLong

    Zero sequence impedance of cable

    I'm trying to calculate the zero sequence impedance of a cable for the calculation of single phase to ground fault and could use some clarification. The cable in question is 3x300/25mm² NA2XS2Y 6/10(12)kV, which there will be installed two of in parallel along with a 35mm² PE conductor. Is...
Back
Top