Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. ProbingStructuralEng_03

    Strut And Tie - Tie Development At Nodes

    Here's my thoughts to your response: 1) That is unfortunate because I feel like I am banging my head against a wall every time this comes up! 2)I agree especially because ACI has provisions to make sure your stirrups are properly anchored. 3)You mention using shear span as an indicator. Why not...
  2. ProbingStructuralEng_03

    Strut And Tie - Tie Development At Nodes

    Hi All, Looking for some input on how you all handle ACI requiring tension ties anchorage at nodes. ACI Section 23.8.2 states Tie reinforcement shall be anchored by mechanical devices, post tensioning anchorage devices, standard hooks or straight bar development in accordance with 23.8.3 (Tie...
  3. ProbingStructuralEng_03

    Elevator Openings In Concrete Core Walls

    Thanks for the replies everyone. I think I am on board with just sticking with a C shaped core. Too much of a pain to rely on the punched portion of wall.
  4. ProbingStructuralEng_03

    Elevator Openings In Concrete Core Walls

    I have recently worked on a project where there was not much insight between the architect or other structural engineers on how required elevator openings are handled for concrete core walls acting as lateral shear walls for the building. The elevator manufacturer's, which have unique...

Part and Inventory Search