Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Giulio Prette

    ETAP UNDERGROUND

    Butb seems the currents are different, maybe you made the calculation for constant temperature and variable current?
  2. Giulio Prette

    SEPAM connection

    Checked this? https://www.se.com/eg/en/faqs/FA337473/
  3. Giulio Prette

    ERROR MESSAGE IN ETAP

    Ok, the diagram seems complete but: Did you configure the generator as swing node?
  4. Giulio Prette

    ERROR MESSAGE IN ETAP

    The messages are self explaining, you can’t perform SC or LF study without basic configuration: Swing node (grid), buses and branch energised.
  5. Giulio Prette

    External Power Cable - Code - Black, Red etc.. is it a standard UK or convention

    For the sheath colors i suppose there are only national standards. For example in italy we have the CEI UNEL 00721 that indicates the colors.

Part and Inventory Search