In my opinion, the most critical thing in managing a engineering/construction project is the control of the quality AND contractual aspects of the design and engineering work. It is very important to know and understand what your engineers do and also which contractual consequences engineering...
is maybe too late to answer this but it may be of some interest anyway.
There is a big difference between FPSO and FSO units.
A FPSO receive the fluid from the well at well-head pressure (high), temperature (hot) and composition (acids, sand, water, etc.).
A FSO receive a on-spec processed...