  1. seo

    lay down area for CCPP

    Sounds like you are talking about a 7FA or W501F. Plan for at least 5 acres per train.
  2. seo

    Shop certification for CSA B51

    My experience in Alberta and Ontario has been similar. We are an EPC contractor and do all of the piping design. We register our design by submitting our Piping Specs, Line List (includes Desigh P and T and Test pressures, and P&ID's. ABSA (alberta) or TSSA (ontario) then issues you a "P"...
  3. seo

    Water Quality for IST OTSG

    An update. I had some errors in the post. The mixed beds produce 0.06 to 0.1 microsiemens conductivity. We did clean the demin tank and re passivate it. We have come to the same conclusion about the CO2. We are looking at polystyrene balls to reduce the surface area of the tank and limit...
  4. seo

    Water Quality for IST OTSG

    We are commisioning a 2x1 combined cycle cogeneration plant. 2 LM6000PD's; 2 IST OTSG's ; 1 siemens Demag Delaval STG. Sinct the boiler is a once through, the limit on cation conductivity is 0.25 microSiemens. Our demineralizer is producing 0.6 microSimens specific conductivity. We have 304...
  5. seo

    Why is the cross limit function in boiler and how does it work?

    Another good source is "Control of Boilers" by Sam Dukelow.