Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. GoToGuy

    U-1 Nozzle Description Incomplete

    I think I found it in 2004. Is is actually U-1(c)(2)(e)?
  2. GoToGuy

    U-1 Nozzle Description Incomplete

    Thanks for your answers/opinions. The Code is a bit mysterious to me. I forgot to mention that the tanks were manufactured in 2002 and the U-1 forms reference the 2001 Code. I will look for U-1(e)(1). Do you happen have a page reference (any edition)? Thanks again.
  3. GoToGuy

    U-1 Nozzle Description Incomplete

    We have some small fluid reservoirs that were designed, built and hydrotested to Section VIII, Div 1. Two of the nozzles welded to the shell are 1/2" IPS pipe. One of the pipes has a 3-piece ball valve flange welded to it, and the other has a reducer, elbow, and threadpiece welded to it. The...

Part and Inventory Search