We have some small fluid reservoirs that were designed, built and hydrotested to Section VIII, Div 1. Two of the nozzles welded to the shell are 1/2" IPS pipe. One of the pipes has a 3-piece ball valve flange welded to it, and the other has a reducer, elbow, and threadpiece welded to it.
The...