We have some small fluid reservoirs that were designed, built and hydrotested to Section VIII, Div 1. Two of the nozzles welded to the shell are 1/2" IPS pipe. One of the pipes has a 3-piece ball valve flange welded to it, and the other has a reducer, elbow, and threadpiece welded to it.
The U-1 forms do not list the added fittings in line 19; only the 1/2" IPS pipe. The weld records indicate that the fittings were added prior to hydrotest.
Are these U-1 forms incomplete?
Follow-up question: If the manufacturer's U stamp has expired, can the U-1 forms be revised?
Thanks
The U-1 forms do not list the added fittings in line 19; only the 1/2" IPS pipe. The weld records indicate that the fittings were added prior to hydrotest.
Are these U-1 forms incomplete?
Follow-up question: If the manufacturer's U stamp has expired, can the U-1 forms be revised?
Thanks