Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations GregLocock on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. Mahi20

    Ground Beam maximun length and level

    Hi I have a about 400m long building foundations (16m c/c) to be tied with ground beam. 1. What s the maximum length of ground beam to be appropriate and if discontinued any effect? 2. Is the ground beam be good at ground level or 2-3m below ground. 3. Any measure to avoid/reduce temperature...
  2. Mahi20

    Deep Trusses Long Span Moment Frames

    Thanks KootK! Appreciate a lot!
  3. Mahi20

    Acceptable criteria for warehouse floors

    Hi, Is there a floor vibration criteria for warehouse floors? I can't find warehouse or storage in DG11. Span grids 24x24m. There are office in Mezzanine floors. Appreciate some advise.
  4. Mahi20

    Deep Trusses Long Span Moment Frames

    Hi, I am looking option for deep trusses moment frame for long span 6 storey storage building on American codes. May I know what the affect column-truss connection to prevent lateral buckling of columns. Similarly secondary trusses to main trusses connection has any issues?

Part and Inventory Search